Latest Posts
Search
image

Year: 2022

The province says it will soon begin permanent repairs to the Coquihalla Highway and the Trans Canada through the Fraser Canyon after last year’s devastating floods. An atmospheric river that formed over southern B.C. last November produced record rainfall, leading to torrential runoff events that destroyed large sections of both major highways. Temporary repairs allowed […]

Read More

As of May 20th: some roadway flooding on TCH#17 between Vermillion Bay and Dryden and on #71 south between Kenora and Fort Frances. SINGLE LANE ALTERNATING TRAFFIC Some CONSTRUCTION ACTIVITY on the #17 Trans-Canada between Manitoba Border and Kenora, and on the #17A Kenora Bypass Route

Read More

BC: The Trans-Canada highway east of Golden (at the Kicking Horse Canyon)  is open 24/7 for the long weekend from Friday noon to Tuesday noon. After the long weekend, the highway will remain open with short (30 min) daytime construction stops, and overnight closures (midnight to 7 am) with detour via Radium. This scheduling pattern […]

Read More

TransCanada FoundLocally Inc. has updated the maps used on its flagship TransCanadaHighway.com website to reflect its broader focus on travel in and across Canada, rather than just along the TransCanada Highway. This is part of an ongoing progression of upgrades started during the COVID lockdowns, to prepare for the expected post-COVID travel boom. New Content […]

Read More

Winter storm watch in effect for City of Winnipeg. Travel on the Trans-Canada will become increasingly difficult as the day progresses Wednesday, with widespread highway closures a near-certainty. Major spring blizzard (20-40 cm) poised to wallop southern Manitoba and southeastern Saskatchewan mid-week…with widespread snowfall accumulations of 30-50 cm accompanied by northerly winds gusting 70-90 km/h […]

Read More

Kicking Horse Highway Closure and Traffic Schedule and Construction Update for Fall 2021 (effective Sept 7) KICKING HORSE CANYON Highway Closure and Traffic Schedule for APRIL & MAY 2022 Major construction is underway on Hwy 1, from Golden Donald Upper Rd to Yoho Bridge (4 km east of Golden). Full access from the east, between  […]

Read More